Home
Minutes Meeting Agendas Board Meeting Packets Annual Reports Audit Reports 10-Year Plan Mission History Contacts Committees
Impoundment Structures Drainage Structures
Annual WQ Reports Monthly WQ Reports Project Reports Water Quality Data Presentations
Permits
River Watch River of Dreams
Contact Us Employment Links

Elm Lake-Farmes Pool - Project 52

Project Location

The Elm Lake-Farmes Pool Project (RLWD Project 52) is located in Marshall County, about 17 miles northeast of Thief River Falls. The drainage area of Judicial Ditch 11 Branch 200, upstream from Elm Lake, is 63 square miles.

Design Considerations

The Elm Lake-Farms Pool Project is designed to accomplish three main objectives: to provide a means of flood control in downstream areas, to improve the value of the area as wildlife habitat, and to improve the drainage in upstream areas.

Stoplog Outlet Structure

The Elm Lake-Farms Pool Project became operational in 1991. It was a cooperative effort between the U.S. Fish and Wildlife Service, the Minnesota Department of Natural Resources, the Red Lake Watershed District, and Ducks Unlimited, with majority of the fuding provided by Ducks Unlimited. At the time of construction, the Elm Lake-Farms Pool Project was the largest Ducks Unlimited project in the lower 48 states.

Project Components

The project consists of approximately nine miles of earthen embankment, an outlet control structure at the southwest end, a rock-lined emergency spillway at the southeast end, and an enlargement of a portion of Branch 200 that feeds into the Lost River impoundment, upstream of the Project 52 structure.

Functional Design Data

Feature
Measurement
Storage
Top of Dam 1145.0 (ft. msl) 19,700 (acre-ft.)
Emergency Spillway 1142.0 (ft. msl) 11,000 (acre-ft.)
Max Summer 1141.0 (ft. msl) 7,500 (acre-ft.)
Typical Summer 1140.0 (ft. msl) 5,500 (acre-ft.)
Typical Winter 1139.0 (ft. msl) 3,500 (acre-ft.)
Drainage Area 63.0 (sq. mi.) --
XHTML 1.1 | CSS | Design by J.Blix